You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Lanjutan Tanggul di Utara Pulau Tidung

Continuation of Embankment Construction in Northern Tidung Island to Complete in November

Seribu Island Water Resource Sub-agency continues the construction of embankment in northern Tidung Island up to west side of Port, RT 07/03, Tidung Island Urban Village, Seribu Selatan Sub-district.

We deploy 21 Blue Taskforce personnel

Seribu Island Water Resource Sub-agency's Coordinator, Ahmad Sofyan, said the construction of the massive cube embankment is a continuation of the northern side in RT 06/03 which has been completed along 135 meters.

Breakwater Repair on East Side of Panggang Island Completed

"The continuation of this construction is responding local resident's request in Musrenbang 2024," he said, Tuesday (9/3).

Sofyan explained that the construction of the continuation of the embankment is carried out along 100 meters with a width of 80 centimeters and a height of 160 centimeters (four layers of massive cubes).

"We deploy 21 Blue Taskforce personnel," he added.

According to him, the construction has been running since September 2, 2024 and is targeted to complete in 60 days.

"Hopefully, the embankment can prevent the island from abrasion and protect residential areas from being hit by waves," he continued.

Meanwhile, one of RW 03 residents, Tidung Island Urban Village, Suratno (52), appreciated the personnel for responding the request.

"Residents will be safer and more comfortable. Tidal wave can be prevented from entering residential areas," he hoped.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye644 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye601 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye600 personDessy Suciati
  4. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye577 personNurito
  5. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye559 personAldi Geri Lumban Tobing